On Board the Rig Drilling the Relief Well
Stephen Wilkes for TIME
On Board the Rig
The drilling begins vertically, pushing down some 10,000 ft. (3,000 m) below the surface of the Gulf. Then the drill's path has to curve into the original well.
Get the Latest Photos from Time.com
Get TIME photos and pictures of the week delivered directly to your inbox.