Out of Newark, New Jersey, and up the west side of the Hudson River, three locomotives lug 63 flatbed freight cars -- almost a mile of Conrail train for United Parcel and the U.S. Postal Service, due in California in 72 hours. Engineer Jim Metzger, 42, flicks his eyes like beacons from digital screens inside his cab to the roadbed and back -- right hand on the throttle controlling 11,400 horses, left hand on the three-tone whistle, two longs, a short and a long at every crossing. Past suburban backyards and friendly waves, through the West Point tunnel, rolling from 35...
To continue reading:
or
Log-In