Electric Reshuffle

The biggest electric steel plant ever to be built in the U.S. was last week proposed by OPM. With an annual capacity of 504,000 tons, the plant (to cost about $8,000,000) will be built with Government money in South Chicago, operated by Republic Steel Corp. It will be ready for part-time operations in eight months.

With this addition, total U.S. electric steel capacity will be 3,900,000 tons, 50% more than at year's beginning. The clean heat of an electric furnace produces tough, highly resilient steels for bullet-resistant armor plate, shells and gun barrels....

Want the full story?

Subscribe Now

Subscribe
Subscribe

Learn more about the benefits of being a TIME subscriber

If you are already a subscriber sign up — registration is free!